Preparing for the cement
The metal for the building arrives
There was still alot of excess sand in the main building that needed to be removed before cement could be poured.
We had to rent the Kubota again (minus the backhoe section) and move the dirt out.
The first section we would be having poured is the kennel run side, so the drainpipe had to be laid in and scrap pipe set into the
drain holes to prevent cement from running into the pipe line. The vertical tubes will be removed once the cement has "set" and
then the actual drain cover will go in.